Service 1 Service 2 Service 3

Services for Seniors

The start date for the Erwin Senior Luncheon will be on Friday, May 3rd, 2024. There have been no bus trips scheduled at this time. If you have any questions, please reach out to Darla Kosty at (607) 936-0310.

The Town of Erwin provides a meeting place for Senior Citizens and helps support activities and trips. For trip information and sign up dates call Darla Kosty 607-936-0310 or email oly213@stny.rr.com. The Senior Citizens meet at the Gang Mills Fire Department, 125 Forest Dr, Painted Post Trip information and Signup dates below The Senior Citizens meet at the Gang Mills Fire Department, 125 Forest Dr, Painted Post

No senior trips available.

The next Senior Luncheon is on 2024-05-03.

Bus trips are scheduled June 20th through October 25th.
Sign ups are the first Friday of the month at the Forest View Gang Mills Fire Department, from 1:30-2:00 pm for Town of Erwin/Village of Painted Post Members and Associates. For outside the Town of Erwin sign up is from 2:00-2:20 pm. The Seniors also organize bus trips to plays, shopping and other point of interest at little or no cost. Call Darla Kosty at 607-936-0310 or email oly213@stny.rr.com for more information.

Contact & Info

for more information

Darla Kosty
Phone: 607-936-0310
email oly213@stny.rr.com

Senior Trip List

Sign-up Date Trip Date Trip Info Price
No senior trips available.

Senior Luncheons

Date Info Price
2024-05-03 The start date for the Erwin Senior Luncheon will be on Friday, May 3rd, 2024. There have been no bus trips scheduled at this time. If you have any questions, please reach out to Darla Kosty at (607) 936-0310. 0
I-86 Ramp Closures 4/12
The New York State Department of Transportation has advised us that westbound traffic along Interstate 86 between Exit 45 (Downtown Corning) and Exit 43 (Painted Post), and Interstate 99 northbound to Interstate 86 westbound (Exit 12), in the Town of Erwin, will be closing beginning 10 p.m. on Friday, April 12th to accommodate sign replacement work. The ramp connecting Interstate 86 westbound traffic to Interstate 99 southbound will also be closed. The roadway is anticipated to reopen by the morning of Saturday, April 13th.
Detours will be posted, please be alert.
Hydrant Flushing in April
Post Image
Smith Hill Bridge is closed as of 3/25

Steuben County has released this notice: "The bridge on Smith Hill Road over the Cohocton River between Curtis Coopers Road and Dyke Road in the Hamlet of Coopers Plains and Town of Erwin, will be closed to all through traffic beginning March 25, 2024 until the completion of the bridge replacement project in November of 2024. The signed off-site detour will consist of Curtis Coopers Road, County Route 4, State Route 415 and Barringer Road."

Job opportunity!

TheTown of Erwin has a new job opportunity. Information including a recruitment brochure can be found at  https://www.pracademicpartners.com/current-recruitments-1.

 

 

Keep Your Pipes Safe!

Think before you flush.  Flushable wipes not so flushable.  How to keep your pipes safe.

Flushable wipes notice.pdf (erwinny.org)

Announcement

Following a nationwide search, the Town has appointed a Deputy Town Manager.  Melissa Greenthal will replace Rita McCarthy as Town Manager when Rita retires in July after 33 years of service to the Town.  More information will follow when Melissa joins the Town in February.

Parks and Volunteers.
Post Image
Parks and Volunteers

The Town of Erwin gratefully recognizes the contribution to the community of the efforts of “Reach the Valley” an outreach of Victory Highway Wesleyan Church for painting 8 picnic tables and 2 benches at Kinsella Park and to thank participants Sarah Jane Capper, Sue Strack, Meri Terwilliger, Gary Putnam, Andy Cole, and Doug Cole.

 

The Town of Erwin gratefully recognizes the contribution to the community of the efforts of Beartown Alliance Church for painting the playground equipment at Scudder Webber Park and to thank participants Kelly Adriance, Max Adriance, Erika Soltis, Becky Soltis, Faith Marmor, Dave Bretch, and Jenn Bretch.

Post Image
Bridge is clear, Rains have come!
Post Image
Post Image
Ames Plaza Update

The Applicant has submitted a revised concept site plan and has committed to no “overnight parking”, no one sleeping in vehicles. It was determined that the revised plan complies with the Town of Erwin Zoning. The next steps are that the applicant must complete a traffic study and submit a full preliminary engineering package to the Planning Board. The Planning Board schedule and agendas are posted on the Town’s website and Facebook page. A deadline for completing the demolition of the former Ames building has been established.

-