Planning Board

Minutes & Agenda Board Info


The Town of Erwin Town Planning Board is composed of seven members appointed by the Town Board. The Planning Board meets on the first Monday of the month at 7:00 pm in the Town Hall. The public is always welcome at these meetings.


Virtual participation is available. Leave a comment or request virtual meeting sign-in information as follows: The public is invited to address the board by sending comments via mail to 310 Town Center Road, Painted Post, NY 14870; via email to townoferwin@erwinny.org; or calling and leaving a message at 607-936-5637.


If you are interested in serving on the Board, please contact the Town of Erwin at townoferwin@erwinny.org.



Available Forms

Form Name Department File Link
Special Use Permit Application Planning Board View File
Subdivision Application Planning Board View File
Short EAF Planning Board View File
Site Plan Application Planning Board View File

Additional Information

Virtual participation is available. Leave a comment or request virtual meeting sign-in information as follows: The public is invited to address the board by sending comments via mail to 310 Town Center Road, Painted Post, NY 14870; via email to townoferwin@erwinny.org; or calling and leaving a message at 607-936-5637.

Updated At: 2023-09-20 13:19:04

Publications

Publication Published File Link
Site Plan Checklist 11/06/23 View File

OFFICIALS

CHAIRMAN
MATT MASLYN
VICE CHAIRMAN
JOHN GARGANO
MEMBER
JAMES MCCARTHY
BRIAN HARPSTER
WAYNE KENNEDY
PAUL MATTISON
IVAN JUBILEE
ALTERNATE
BRYAN DUKE
HEATHER FORD
I-86 Ramp Closures 4/12
The New York State Department of Transportation has advised us that westbound traffic along Interstate 86 between Exit 45 (Downtown Corning) and Exit 43 (Painted Post), and Interstate 99 northbound to Interstate 86 westbound (Exit 12), in the Town of Erwin, will be closing beginning 10 p.m. on Friday, April 12th to accommodate sign replacement work. The ramp connecting Interstate 86 westbound traffic to Interstate 99 southbound will also be closed. The roadway is anticipated to reopen by the morning of Saturday, April 13th.
Detours will be posted, please be alert.
Hydrant Flushing in April
Post Image
Smith Hill Bridge is closed as of 3/25

Steuben County has released this notice: "The bridge on Smith Hill Road over the Cohocton River between Curtis Coopers Road and Dyke Road in the Hamlet of Coopers Plains and Town of Erwin, will be closed to all through traffic beginning March 25, 2024 until the completion of the bridge replacement project in November of 2024. The signed off-site detour will consist of Curtis Coopers Road, County Route 4, State Route 415 and Barringer Road."

Job opportunity!

TheTown of Erwin has a new job opportunity. Information including a recruitment brochure can be found at  https://www.pracademicpartners.com/current-recruitments-1.

 

 

Keep Your Pipes Safe!

Think before you flush.  Flushable wipes not so flushable.  How to keep your pipes safe.

Flushable wipes notice.pdf (erwinny.org)

Announcement

Following a nationwide search, the Town has appointed a Deputy Town Manager.  Melissa Greenthal will replace Rita McCarthy as Town Manager when Rita retires in July after 33 years of service to the Town.  More information will follow when Melissa joins the Town in February.

Parks and Volunteers.
Post Image
Parks and Volunteers

The Town of Erwin gratefully recognizes the contribution to the community of the efforts of “Reach the Valley” an outreach of Victory Highway Wesleyan Church for painting 8 picnic tables and 2 benches at Kinsella Park and to thank participants Sarah Jane Capper, Sue Strack, Meri Terwilliger, Gary Putnam, Andy Cole, and Doug Cole.

 

The Town of Erwin gratefully recognizes the contribution to the community of the efforts of Beartown Alliance Church for painting the playground equipment at Scudder Webber Park and to thank participants Kelly Adriance, Max Adriance, Erika Soltis, Becky Soltis, Faith Marmor, Dave Bretch, and Jenn Bretch.

Post Image
Bridge is clear, Rains have come!
Post Image
Post Image
Ames Plaza Update

The Applicant has submitted a revised concept site plan and has committed to no “overnight parking”, no one sleeping in vehicles. It was determined that the revised plan complies with the Town of Erwin Zoning. The next steps are that the applicant must complete a traffic study and submit a full preliminary engineering package to the Planning Board. The Planning Board schedule and agendas are posted on the Town’s website and Facebook page. A deadline for completing the demolition of the former Ames building has been established.

-